LORIENT BRETAGNE SUD

Lorient, France | 2017 | Railway station
Share project

 Multi-modal Transport Hub – bus station – urban footbridge

  • Client: SNCF Gares & Connexions, SNCF Réseau, Lorient Conurbation
  • Project management: AREP / J.M. Duthilleul, E. Tricaud
  • Structure and Façades: H.D.A. Hugh Dutton et Associés
  • Framework: Wood frame and metal structure: Mathis et Baudin Châteaunef; Façades: A.C.M.L.; Foundations and concrete structure: S.R.B.
  • Handover: May 2017


BUILDING WORKS

The passenger building accommodates a large concourse featuring a Douglas-fir timber frame as well as concrete floors, columns and beams that ensure stability.
  • The structure consists of 24 portal frames made of Douglas-fir laminated timber having a span of between 12 and 19 metres and a height of 11 metres. The stress in the braces is distributed to the concrete structure over a length of 113 metres by the timber roof plan.
  •  The footbridge forms a 60-metre link between the two sides of the tracks and consists of two spans of 30 metres each.
  • The bus station shelter stretches out over 160 metres and forms a canopy supported by beams set every 4.80 metres.
The Lorient multi-modal transport hub is part of the “Bretagne à Grande Vitesse” project (“High-speed rail for Brittany”), which will allow a three-hour total travel time between Quimper, Brest and Paris from July 2017

 The station is being rebuilt to the south, close to the city centre and in the heart of the transport hub. An urban footbridge both allows to access the platforms and links Kerentrech district to the city centre during the station opening hours.  The main façade opens up to the heart of the city and alludes to the city’s shipbuilding tradition. The linear form of the building, stretching over 115 metres, gives the station an imposing presence. The double skin made of fibre-reinforced concrete accommodates all the openings related to the various elements of the project (station entrance, retail outlets, offices) and protects the façade from solar radiation.  The north façade is mostly glazed and its large openings allow views of the new TER platform (express regional lines), the rail tracks, the future north access and the historic district of Kerentrech.

 >> Click here to view the video of the project

Last project news

2017-05-23 15:32:41
Lorient Bretagne Sud, inauguration officielle de la gare
La nouvelle gare de Lorient a été inaugurée ce samedi 20 mai 2017. Etienne Tricaud, Architecte-Ingénieur et Président d’AREP a présenté le projet à Jean-Yves Le Drian, Président de la région Bretagne -aujourd'hui ministre des Affaires étrangères- et à Norbert Métairie, Maire de Lorient.