MASSY MULTIMODAL HUB

Massy, France | 2012 | Urban Transport Facilities
Share project

Multimodal hub - Footbridge

  • Client: SNCF, RFF, RATP, SEM Massy
  • Prime Contractor: G&C and AREP (walkway and SNCF service building work section) / Structural Department (IG-OA St12) / Engineering Division Infrastructure Department – Rail Sections Division /RATP – (RATP service building)
  • Delivery: 2010
Massy-Palaiseau railway station’s new walkway has come into operation gradually since February 2012.
This was a complex project on a unique site managed by several operators (RATP, SNCF and APTR). The walkway has profoundly changed the quality of the pedestrian route between the different modes of transport on the site. It is a link in the true sense of the word, offering a sheltered and well-lit connection between Massy East and Massy West, the RER B and C line stations, bus stations and forecourt located at each end.